POTUS Speech
POTUS Speech

Project Description

Working with Federal Hall National Monument, security personnel, and the staff of the President of the United States, Shadowbox Design management was responsible for installing, operating, and dismantling a comprehensive production package that included lighting, audio, and staging.

For the press event, Shadowbox Design Management designed and set up a small stage featuring a lectern, navy blue pipe and drape for backdrop, a distributed audio system for clear sound throughout the space, and a lighting setup specifically designed to illuminate the speakers on stage. Collaborating with the Federal Hall National Monument and working within the context of security for a Presidential event adds a layer of complexity that showcases Shadowbox Design Management’s ability to manage intricate logistics and adhere to high standards of professionalism.